Investment opportunities in Qazvin Province
Investment packages
Qazvin Province
List and profile for presentation to the political agencies of the Islamic Republic of Iran.
21Investment packages
Package details and incentives
Investment amounts in EUROn smaller screens, scroll the table horizontally to view all columns.
| No. | Investment Package Title | Capacity | Investment Amount (EUR) | Related Incentives / Support Measures |
|---|---|---|---|---|
| 1 | Establishment of a Takestan Agricultural Logistics Park | More than 300,000 tonnes | EUR 3.5 million | The project site has been identified. Preliminary studies have been completed and are ready to be presented to investors. The land is ready for handover and the required legal permits have been obtained. |
| 2 | Establishment of Qazvin Logistics Village | 13.8 million tonnes of freight by the project horizon | EUR 15.2 million | Preliminary studies have been completed and are ready to be presented to investors. The site has been identified; land handover arrangements are in place and the required legal permits have been obtained. |
| 3 | Extension of the Hashtgerd Metro Line to Qazvin | According to studies, by the year 2029 (Iranian calendar): capacity of 13,451 PPHPD (passengers per hour per direction) | EUR 15.2 million | Preliminary studies have been completed and are ready to be presented to investors. The site has been identified; land handover arrangements are in place and the required legal permits have been obtained. |
| 4 | Completion of Cold Storage Facility Construction | 32,000 tonnes | EUR 12.5 million | Transfer of an operational-ready factory and cold storage facility; 100% physical progress; located alongside the Qazvin–Zanjan highway; considered one of the province’s strategic and urgently needed capacities and a quick-yield project. |
| 5 | Fruit Concentrate Plant | Not stated | EUR 8.4 million | Transfer of an operational-ready factory and cold storage facility; 100% physical progress; located alongside the Qazvin–Zanjan highway. |
| 6 | Shahroud Nine-Unit Fish Farming Complexes | 9,000 tonnes per year | EUR 16 million | Preliminary studies have been completed and are ready to be presented to investors. The site has been identified; land handover arrangements are in place and the required legal permits have been obtained. |
| 7 | Export Terminal and Origin Loading Yard for Agricultural and Food Products | More than 280,000 tonnes in total across 4 terminals | EUR 6 million | Preliminary studies have been completed and are ready to be presented to investors. The site has been identified; land handover arrangements are in place and the required legal permits have been obtained. |
| 8 | Yaleh Gonbad–Zeytak Hot Spring Tourism Sample Area | Not stated | EUR 2 million | Pursuant to Cabinet Resolution No. 6843/T32400 dated 1 May 2005: following approval of a tourism sample area in eligible parts of the country, all ministries, organizations, institutions and state-owned companies are required, after its establishment, to provide their services to investors up to the entrance of the area, under the conditions and tariffs approved for neighbouring cities and villages, in support of investment in the area. |
| 9 | Phase II Greenhouse Projects of the Nowdehak Greenhouse Complex | 54,000 tonnes per year | EUR 30 million | Land allocation with payment by instalments; water supply from Nohob Dam; access to certain tax incentives. Required permits (establishment, foreign participation and environmental permits) have been obtained. The feasibility study is available. Access to production infrastructure (electricity, water, telephone, fuel, etc.) is possible. |
| 10 | Asadi Historic House Traditional Accommodation | 10,000 visitors per year | EUR 28 million | Cooperation and consultation on building restoration; eligibility to use tourism tariffs for energy costs; follow-up and assistance in obtaining required clearances. Tax incentives pursuant to Article 8 of the Law on the Development of the Tourism and Travel Industry. |
| 11 | Mahmoud Beheshti Historic House Traditional Accommodation | 20,000 (unit not specified) | EUR 240,000 | Cooperation and consultation on building restoration; eligibility to use tourism tariffs for energy costs; follow-up and assistance in obtaining required clearances. Tax incentives pursuant to Article 8 of the Law on the Development of the Tourism and Travel Industry. |
| 12 | Traditional Accommodation and Traditional Restaurant at the Historic Shetr Khwab Musa Vazir Building | 25,000 persons | EUR 240,000 | Cooperation and consultation on building restoration; eligibility to use tourism tariffs for energy costs; follow-up and assistance in obtaining required clearances. Tax incentives pursuant to Article 8 of the Law on the Development of the Tourism and Travel Industry. |
| 13 | Avaj Historic Caravanserai Traditional Accommodation | 13,000 persons | EUR 2.6 million | Cooperation and consultation on building restoration; eligibility to use tourism tariffs for energy costs; follow-up and assistance in obtaining required clearances. Tax incentives pursuant to Article 8 of the Law on the Development of the Tourism and Travel Industry. |
| 14 | Kharzan Historic Caravanserai Traditional Accommodation | 5,000 persons | EUR 660,000 | Cooperation and consultation on building restoration; eligibility to use tourism tariffs for energy costs; follow-up and assistance in obtaining required clearances. Under the Law on the Encouragement and Protection of Foreign Investment, at least 10% of the country’s total foreign-financing (finance) quota must be allocated to the development of tourism and handicrafts projects. |
| 15 | Shah Abbasi Hejib Historic Caravanserai Traditional Accommodation | 30,000 persons | EUR 3 million | Cooperation and consultation on building restoration; eligibility to use tourism tariffs for energy costs; follow-up and assistance in obtaining required clearances. |
| 16 | Pich Bon Historic Caravanserai Traditional Accommodation and Restaurant | 8,000 persons | EUR 360,000 | Cooperation and consultation on building restoration; eligibility to use tourism tariffs for energy costs; follow-up and assistance in obtaining required clearances. Tax incentives pursuant to Article 8 of the Law on the Development of the Tourism and Travel Industry. |
| 17 | Ziyaran Diversion Dam Water Tourism Complex and Khouznan Tourism Complex | 50,000 (unit not specified) | EUR 880,000 | Cooperation and consultation on building restoration; eligibility to use tourism tariffs for energy costs; follow-up and assistance in obtaining required clearances. Tax incentives pursuant to Article 8 of the Law on the Development of the Tourism and Travel Industry. |
| 18 | Nohob Dam Water Tourism Complex | 25,000 persons | EUR 160,000 | Cooperation and consultation on building restoration; eligibility to use tourism tariffs for energy costs; follow-up and assistance in obtaining required clearances. Tax incentives pursuant to Article 8 of the Law on the Development of the Tourism and Travel Industry. |
| 19 | Laleh Alamut Public Tourism Complex | 25,000 persons | EUR 2.5 million | Eligibility to use tourism tariffs for energy costs; follow-up and assistance in obtaining required clearances. Under the tourism development law, to accelerate the development of hotels, accommodation facilities and other tourism establishments, upon the request of the Cultural Heritage and Tourism Organization, the National Land and Housing Organization is required to make the required land available to investors at the appraised price under a five-year lease-to-own arrangement. The Forests, Rangelands and Watershed Management Organization, provincial Natural Resources Departments and the Land Affairs Organization of the Ministry of Agriculture Jihad are required to provide the required land to investors at regional prices. |
| 20 | Five-Star Hotel (South of the City Hall) | 80,000 persons | EUR 8.8 million | Eligibility to use tourism tariffs for energy costs; follow-up and assistance in obtaining required clearances. Change of land use for hotel development will be reviewed and processed on an expedited basis by the Article 5 Commission. In Qazvin Province, conversion of historic buildings into accommodation and catering facilities is to be carried out free of charge. Fees arising from land-use change and the sale of additional building density are payable by investors to the relevant municipality in instalments over five to ten years, starting from commencement of operation. |
| 21 | Diethylhexanol Production | Not stated | EUR 8.2 million | 5% discount on the total contract value for foreign investors; special tax exemptions for industrial parks and zones under the Direct Taxation Law for a period of 7 to 13 years; no need to obtain separate permits from multiple departments and organizations; construction permits and completion certificates issued free of charge and in the shortest possible time. |
Translator’s note
Translator’s note: The source heading refers to 10 investment packages, while the source table contains 21 numbered entries. The numbering and entries have been retained as presented. Where a unit or capacity is not specified in the source, this is indicated accordingly.