Qazvin Chamber of Commerce, Industries, Mines and Agriculture
Office hours: 08:00–16:00028–3456
Investment opportunitiesQazvin Province

Investment opportunities in Qazvin Province

Investment packages
Qazvin Province

List and profile for presentation to the political agencies of the Islamic Republic of Iran.

21Investment packages

Package details and incentives

Investment amounts in EUR

On smaller screens, scroll the table horizontally to view all columns.

List and Profile of Investment Packages in Qazvin Province for Presentation to the Political Agencies of the Islamic Republic of Iran
No.Investment Package TitleCapacityInvestment Amount (EUR)Related Incentives / Support Measures
1Establishment of a Takestan Agricultural Logistics ParkMore than 300,000 tonnesEUR 3.5 millionThe project site has been identified. Preliminary studies have been completed and are ready to be presented to investors. The land is ready for handover and the required legal permits have been obtained.
2Establishment of Qazvin Logistics Village13.8 million tonnes of freight by the project horizonEUR 15.2 millionPreliminary studies have been completed and are ready to be presented to investors. The site has been identified; land handover arrangements are in place and the required legal permits have been obtained.
3Extension of the Hashtgerd Metro Line to QazvinAccording to studies, by the year 2029 (Iranian calendar): capacity of 13,451 PPHPD (passengers per hour per direction)EUR 15.2 millionPreliminary studies have been completed and are ready to be presented to investors. The site has been identified; land handover arrangements are in place and the required legal permits have been obtained.
4Completion of Cold Storage Facility Construction32,000 tonnesEUR 12.5 millionTransfer of an operational-ready factory and cold storage facility; 100% physical progress; located alongside the Qazvin–Zanjan highway; considered one of the province’s strategic and urgently needed capacities and a quick-yield project.
5Fruit Concentrate PlantNot statedEUR 8.4 millionTransfer of an operational-ready factory and cold storage facility; 100% physical progress; located alongside the Qazvin–Zanjan highway.
6Shahroud Nine-Unit Fish Farming Complexes9,000 tonnes per yearEUR 16 millionPreliminary studies have been completed and are ready to be presented to investors. The site has been identified; land handover arrangements are in place and the required legal permits have been obtained.
7Export Terminal and Origin Loading Yard for Agricultural and Food ProductsMore than 280,000 tonnes in total across 4 terminalsEUR 6 millionPreliminary studies have been completed and are ready to be presented to investors. The site has been identified; land handover arrangements are in place and the required legal permits have been obtained.
8Yaleh Gonbad–Zeytak Hot Spring Tourism Sample AreaNot statedEUR 2 millionPursuant to Cabinet Resolution No. 6843/T32400 dated 1 May 2005: following approval of a tourism sample area in eligible parts of the country, all ministries, organizations, institutions and state-owned companies are required, after its establishment, to provide their services to investors up to the entrance of the area, under the conditions and tariffs approved for neighbouring cities and villages, in support of investment in the area.
9Phase II Greenhouse Projects of the Nowdehak Greenhouse Complex54,000 tonnes per yearEUR 30 millionLand allocation with payment by instalments; water supply from Nohob Dam; access to certain tax incentives. Required permits (establishment, foreign participation and environmental permits) have been obtained. The feasibility study is available. Access to production infrastructure (electricity, water, telephone, fuel, etc.) is possible.
10Asadi Historic House Traditional Accommodation10,000 visitors per yearEUR 28 millionCooperation and consultation on building restoration; eligibility to use tourism tariffs for energy costs; follow-up and assistance in obtaining required clearances. Tax incentives pursuant to Article 8 of the Law on the Development of the Tourism and Travel Industry.
11Mahmoud Beheshti Historic House Traditional Accommodation20,000 (unit not specified)EUR 240,000Cooperation and consultation on building restoration; eligibility to use tourism tariffs for energy costs; follow-up and assistance in obtaining required clearances. Tax incentives pursuant to Article 8 of the Law on the Development of the Tourism and Travel Industry.
12Traditional Accommodation and Traditional Restaurant at the Historic Shetr Khwab Musa Vazir Building25,000 personsEUR 240,000Cooperation and consultation on building restoration; eligibility to use tourism tariffs for energy costs; follow-up and assistance in obtaining required clearances. Tax incentives pursuant to Article 8 of the Law on the Development of the Tourism and Travel Industry.
13Avaj Historic Caravanserai Traditional Accommodation13,000 personsEUR 2.6 millionCooperation and consultation on building restoration; eligibility to use tourism tariffs for energy costs; follow-up and assistance in obtaining required clearances. Tax incentives pursuant to Article 8 of the Law on the Development of the Tourism and Travel Industry.
14Kharzan Historic Caravanserai Traditional Accommodation5,000 personsEUR 660,000Cooperation and consultation on building restoration; eligibility to use tourism tariffs for energy costs; follow-up and assistance in obtaining required clearances. Under the Law on the Encouragement and Protection of Foreign Investment, at least 10% of the country’s total foreign-financing (finance) quota must be allocated to the development of tourism and handicrafts projects.
15Shah Abbasi Hejib Historic Caravanserai Traditional Accommodation30,000 personsEUR 3 millionCooperation and consultation on building restoration; eligibility to use tourism tariffs for energy costs; follow-up and assistance in obtaining required clearances.
16Pich Bon Historic Caravanserai Traditional Accommodation and Restaurant8,000 personsEUR 360,000Cooperation and consultation on building restoration; eligibility to use tourism tariffs for energy costs; follow-up and assistance in obtaining required clearances. Tax incentives pursuant to Article 8 of the Law on the Development of the Tourism and Travel Industry.
17Ziyaran Diversion Dam Water Tourism Complex and Khouznan Tourism Complex50,000 (unit not specified)EUR 880,000Cooperation and consultation on building restoration; eligibility to use tourism tariffs for energy costs; follow-up and assistance in obtaining required clearances. Tax incentives pursuant to Article 8 of the Law on the Development of the Tourism and Travel Industry.
18Nohob Dam Water Tourism Complex25,000 personsEUR 160,000Cooperation and consultation on building restoration; eligibility to use tourism tariffs for energy costs; follow-up and assistance in obtaining required clearances. Tax incentives pursuant to Article 8 of the Law on the Development of the Tourism and Travel Industry.
19Laleh Alamut Public Tourism Complex25,000 personsEUR 2.5 millionEligibility to use tourism tariffs for energy costs; follow-up and assistance in obtaining required clearances. Under the tourism development law, to accelerate the development of hotels, accommodation facilities and other tourism establishments, upon the request of the Cultural Heritage and Tourism Organization, the National Land and Housing Organization is required to make the required land available to investors at the appraised price under a five-year lease-to-own arrangement. The Forests, Rangelands and Watershed Management Organization, provincial Natural Resources Departments and the Land Affairs Organization of the Ministry of Agriculture Jihad are required to provide the required land to investors at regional prices.
20Five-Star Hotel (South of the City Hall)80,000 personsEUR 8.8 millionEligibility to use tourism tariffs for energy costs; follow-up and assistance in obtaining required clearances. Change of land use for hotel development will be reviewed and processed on an expedited basis by the Article 5 Commission. In Qazvin Province, conversion of historic buildings into accommodation and catering facilities is to be carried out free of charge. Fees arising from land-use change and the sale of additional building density are payable by investors to the relevant municipality in instalments over five to ten years, starting from commencement of operation.
21Diethylhexanol ProductionNot statedEUR 8.2 million5% discount on the total contract value for foreign investors; special tax exemptions for industrial parks and zones under the Direct Taxation Law for a period of 7 to 13 years; no need to obtain separate permits from multiple departments and organizations; construction permits and completion certificates issued free of charge and in the shortest possible time.
Translator’s note

Translator’s note: The source heading refers to 10 investment packages, while the source table contains 21 numbered entries. The numbering and entries have been retained as presented. Where a unit or capacity is not specified in the source, this is indicated accordingly.